Brooer spring tee concealed suspension system used by designers and contractors to meet the increasingdemand for the metal pan.
Brooer spring tee systems is most suited for this ceiling application. When used in conjunction with any range of Brooer metal tiles architects and designers can meet their customers need.
BrooeBrooer Spring tee system is manufacture specifically of combine the maximum “Springiness” with optimum grip. These provide the major advantages of demount ability and security.
In addition to suspension component, Brooer spring tee system also includes accessories such as clip sets and connector which ensures that a totally integrated system is available.
Brooer spring tee ceiling system has been successfully tested and attained BS test of building material and structures BS 476 Part 20 or ASTM E-119 using Brooer Metal pan tiles. Further information regarding fire production tests is available from the sales department .all component have a corrosion resistant finish suitable for areas of
normal temperature and humidity. The system will not deteriorate physically unless exposed to rough treatment or aggressive atmospheres. Spring tee and primary channel are easily assembled without the need for special tools. The tiles simply clip into .No routine maintenance is required.
Invisible Frame Type Square Ceiling Installation (Clip-in)
Installing the side-line in the same height, installing light steel main channel in appreciate space. Suspension hanger can be: suspension wire, rigid, strap hanger, rigid adjustable rods or threaded bar. Please refer to architect’s recommendation. Hunger should not exceed 1200 mm of span across the primary structure. Perimeter trims or channel should be securely fixed at 450mm centers and joints neatly aligned especially at internal and external conditions. Binding the light main channel with the prepared hanging parts on the Triangle keel, then clamp it under the light steel main keel in the vertical direction, the space of the triangle keel accords to the width of plate. Then it is necessary to adjust it plane after finishing installation. Pressing the two parallel edges into triangle keel slot, firstly installing one row of plate breadthwise and lengthways, make sure they are perpendicular, then installing the rest plates.
Pressing the Square plates lightly, make sure the gap is perpendicular.
Wearing gloves when installing plate ,it finger printers or stains on the plate ,please remove it off with warm.
Brooer Clip-in Tiles System
Plain & Perforated Tiles (Clip-In)
Spring Tee / Main Channel / U-Trim